Traffic arrangements at Dadar Station

            In view of the smooth flow of traffic and convince to the commuters following traffic regulations made effective for 24 hrs.

1.         ONE WAY ” for all types of  Motor Vehicles from Shubham Veg Hotel (Hanuman Mandir), Dadar Terminal Railway Station (East) upto Lakhamsi Nappo Road, Electrical pole no. LNR/57/A and Bella View Building. 

2.         “NO ENTRY” for all types of Motor Vehicles from Lakhamsi Nappo Road, Electrical pole no. LNR/57/A and Bella View Building upto Shubham Veg Hotel (Hanuman Mandir), Dadar Terminal Railway Station (East).

        The Traffic Police would also be placing Directional Boards to guide the motorist/ pedestrians besides Traffic Police Staff being posted at these places to render assistance, and to ensure that lowest inconvenience is caused to the road users.     

Traffic arrangements at Dadar Station (Marathi )

Traffic arrangements at Sion

In view of the smooth flow of traffic and convince to the local public following traffic regulations are made effective for 24 hrs. till the completion of Tata cable line excavation work.

1. “ONE WAY” for all types of Motor Vehicles plying from Antophill Police Beat Chowky, Mukundrao Ambedkar Road towards Pratiksha Nagar, Sardar Nagar No.1 (Flank Road) and will exit from Dukkar Galli, Makkawadi Junction on Mukundrao Ambedkar Road.

2. “NO ENTRY” for all types of Motor Vehicles from Mukundrao Ambedkar Road, Dukkar Galli- Makkawadi Junction to Hemant Manjrekar Marg towards Pratiksha Nagar & Sardar Nagar Road No.1.

3. “NO Right Turn ” for all types of Motor Vehicles plying from Pratiksha Nagar Best Depot towards Sardar Nagar No.1, (Flank Road) via Shivaji Chowk from OM Dugdhalaya & Eel. Pole No-SKH/18/1

The Traffic Police would also be placing Directional Boards to guide the motorist/ pedestrians besides Traffic Police Staff being posted at these places to render assistance, and to ensure that lowest inconvenience is caused to the road users.

Traffic arrangements at Sion (Marathi)

Pressnote on Drunken Driving

( On 8th March, 2010 61 drivers sent to simple imprisonment for drunken driving )

l(Click here)

Cases of Drunken & Dangerours Driving

Following chart shows the punishments awarded in the cases of (section 185 M.V Act) Drunken Driving & (section 184 M.V.Act) Dangerous Driving till today.

HEAD
2007(From 20th June till 31st Dec, 2007)
2008
2009

2009 till 8th March,2010

Cases of Drunken Driving

11416
16450
14681
3231
Simple Imprisonment under section 185 M.V. ACT  (Drunken Driving)
2623
8448
10097
2085
Suspension of Motor Driving Licence for  Drunken Driving
2798
8237
9484
1861

Following chart shows the cases during Special Drives conducted by Mumbai Traffic Police from 20th June, 2007 till date.

HEAD
CASES 
Total No. Drunken Driving Cases
45778
Total No. of simple imprisonment
23253
Total No. of Suspension of licences
22380
   

 

Notification on traffic arrangements for the construction work of King Circle Flyover at Matunga

In view of the construction of obligatory span work of King Circle-Tulpule Flyover Bridge, Matunga following temporarily traffic regulations made effective for 24 hrs.till completion of obligatory span work.

All kinds of Heavy vehicles including BEST buses, Tourist buses, School buses, excluding light vehicles plying from Five garden, Matunga towards Ruia Junction, Hindu Colony will take left turn at L.J. Road Junction towards Dadar T.T. for proceeding to Ruia Junction, Hindu colony.

“No Right turn” for all kinds of south bound vehicles plying from Dr. B.A.Road at
L .J. Road Junction.

All kinds of heavy vehicles including BEST buses, Tourist buses, School buses, excluding light vehicles plying from Ruia Junction, Hindu Colony towards Five

Garden will take left turn at L.J.Road Junction towards Maheshwari Udyan Junction for proceeding to Five Garden.

All kinds of north bound vehicles plying from Dadar T.T. towards Five Garden will take right turn under King Circle-Tulpule Bridge on Dr. B.A. Road.

“ No Entry ”for all kinds of Heavy vehicals including BEST buses, Tourist buses, School buses plying from Five Garden towards Ruia Junction, Hindu Colony and vice versa.

The Traffic Police would also be placing Directional Boards to guide the motorist/ pedestrians besides Traffic Police Staff being posted at these places to render assistance, and to ensure that lowest inconvenience is caused to the road users.

Traffic arrangements at Matunga Traffic Division

(Click here for Marathi)

In view of construction of concrete work at Road No.29, Sion(East) and in order to facilitate smooth flow of traffic and safety of people following traffic regulations will be made effective for 24 hrs till completion of aforesaid concrete work.

1. “No Entry” for all types of motor vehicles plying from Road no.29, Sion (East) from north to south direction i.e. from Shanti Niketan building to Tamarind tree situated at the junction of Road no.28 & Road no. 6

2. “No Parking” of all types of motor vehicles on Road no.29, Sion (East) from Shanti Niketan building to Tamarind tree situated at the junction of Road no.28 & Road no.6 .

In view of construction of concrete work at Edenwala Road and in order to facilitate smooth flow of traffic and safety of people following traffic regulations will be made effective for 24 hrs till completion of concrete work.

1. “No Entry” for all types of motor vehicles plying from Edanwala Road ( Electrical Pole No.AD/1 ) to Gamrubhai Oza Chowk ( Electrical Pole No. AJJ/3 ) for 24 hrs.

2. “No Parking” of all types of motor vehicles on the Eastern side of Edenwala Road (Electrical Pole No. FGT/11/E) to Gamrubhai Oza Chowk (Electrical Pole No. AJJ/3) for 24 hrs.

In view of construction of Monorail work at Katrak Road (Albela Hanuman Chowk to D.S.Baretto chowk) and in order to facilitate smooth flow of traffic and safety of people following traffic regulations will be made effective for 24 hrs till completion of Monorail work.

1. “No Entry” for all type of motor vehicles on Katrak Road from Vitthal Rukmini Chowk (Electrical pole no. KR/137 to D.S. Baretto Chowk (Electrical pole no. WDJ-4) and vice versa.

2. “No Entry” for all type of heavy vehicles including trucks, tempos, goods vehicles and BEST Buses from Albela Hanuman Chowk (Electrical pole no. KR/117 to D.S. Baretto Chowk and vice versa.

3. All types of heavy vehicles including trucks, tempos, goods vehicle and BEST buses plying from Tilak Road, G.D. Ambekar Road & R.A.K. Road towards Katrak Road will be using alternate Balaram Khedekar Marg.

4. Only light motor vehicles will ply from Albela Hanuman Chowk (Electrical pole no. KR/117 upto Vitthal Rukmini Chowk and vice versa.

The Traffic Police would also be placing Directional Boards to guide the motorist/ pedestrians besides Traffic Police Staff being posted at these places to render assistance, and to ensure that lowest inconvenience is caused to the road users.

Notification on No Right Turn at Hill Road, Bandra

O R D E R

No. 134/DCP/T/TEMP/2009.

There shall be "No Right Turn" for the vehicles proceeding to Band Stand at the junction of Hill Road and B.J. Road for 24 Hrs.

The above order is issued on experimental basis for 15 days from 1800 hrs. on 18/12/2009to 01/01/2010 and shall be continued on permanent basis if there is no any problem.

Special Drive Statistics

                                Mumbai Traffic Police made out  cases under following heads for the week from  1st March, 2010 to  7th March, 2009

 

Dangerous

Driving

 

Speeding

 

Jumping Signal

 

P.U.C.

 

Unnecessary Honking

Horn

 

No

Parking

 

using Mobile while driving

 

Seat Belts

 

Helmet

 

Others

 

Total

fine

 

Total

fine

 

162 455 6139 94 424 12288 212 852 3612 11288 35526 2377800

   Towing of vehicles parked in  “ No Parking “ areas

Two

Wheeler

 

Compounding

Charges

 

Four

Wheeler

 

Compounding

Charges

 

Total

Cases

 

Total Compounding

Charges

 

4709
330000
3726
179700
8435
509700

           

 

                    

   

 

 

Traffic arrangements at Sane Guruji Marg, Mumbai

(Marathi)

Regarding 25 year old ( Yellow& Black ) Taxi

Click here for List of 25 year old Taxi's

 

Traffic arrangements due to Metro Rly Project at Ghatkopar (West)

In view of the Metro Rly. works carried out by the Mumbai Metro One Pvt. Ltd. Company a large number of vehicular traffic will be diverted. In order to facilitate smooth flow of traffic the following traffic regulations will be made from 19th Feb, 2008

Ghatkopar (West) :-

1. Movements of all types of Heavy Motor vehicles shall be prohibited on the

L.B.S Road, Ghatkopar (W) from its junction with Vasantdada Patil Marg (Ghatkopar link Road Junction) to Kamani-Kwrla (West). Junction from

08.00 hrs to 11.30 hrs and 17.00 hrs to 21.00 hrs.

2. The Dhruvaraj Marg, Ghatkopar (W) shall be One Way from its junction with L.B.S Marg to its Junction with J.P Road, all types of vehicles intending to go towards Ghatkopar Station shall use Keshavrao Kharat Marg, Laxminarayan Road

( Uday Cinema Lane) and J.P Road.

3. The Laxminarayan Road, Ghatkopar (W) shall be One Way from its junction

with Dhruvaraj marg, Ghatkopar (W) to its junction with J.V Road.

4. Parking of all types of Motor vehicles shall be prohibited on either sides of Keshavrava Kharat Marg, Ghatkopar (W).

5. Parking of all types of motor vehicles shall be prohibited on either sides of the Dhruvaraj Marg, Ghatkopar (W)

6. Right turn shall be permitted on the M.G. Road from its junction with L.B.S Road (R.B. Kadam Junction ) towards Sarvoday Junction.

7. Movements of all types of vehicles shall be prohibited on the Hirachand Desai Road, Ghatkopar (W) from Sarvoday Junction to J.V Road Junction (near Bata shop).

Informatory boards will be placed at various places. Traffic Police personnel will be posted to guide in order to ensure that least inconvenience is caused to the motorists. However, delays may be anticipated and journey be planned accordingly.

Traffic arrangements due to Metro Rly Project at D.N. Nagar in Mumbai

(Click here for Marathi)

Proposed works of Metro -One Railway & Traffic Regulations

In View of the proposed works of Metro One Railway being carried out By the Mumbai Metro One Pvt. Ltd. Company in the jurisdiction of the D.N. Nagar Traffic Division, Andheri (W), Mumbai and in order to prevent danger, obstructions and inconvenience to the public, movement of vehicular traffic shall be regulated from 20th February, 2009, as under.

ONE WAY ROADS

1 ) The Bhardawadi Lane, Andheri (W)shall be ‘One way’ from its junction with S.V.Road to its junction with J.P. Road, i.e. there shall be No Entry for all types of motor vehicles on the Bhardawadi lane from its junction with J.P. Road towards S.V. Road. i.e. from West to East direction.
2) 'No entry' for all motor vehicles on the J. P. Road, Andheri ( W) from S.V. Road upto Navrang Cinema. 'No entry' for all vehicles from Navrang cinema on J. P. Road towards S.V.Road.

 

NO PARKING

1) Parking of all types of motor vehicles shall be prohibited on either sides of the Bhardawadi Lane, Andheri (W) from its junction with S.V. Road to Its junction with J.P. Road, for 24 Hrs.

2) Parking of all types of motor vehicles shall be prohibited on either sides of the Caesar Road , Andheri (W) from its junction with S.V. Road (Amboli Junction) to Its junction with J.P. Road, for 24 Hrs.


Traffic Safety

 

You are Visitor No.

 

SMS ALERT

SMS Alert

(Click here)

Tariff Cards

© 2007-2008 Mumbai Traffic Police | Best viewed with IE 7.0 / IE 6.0 / IE 5.5 / FF
Powered by DatamaticsPowered by: Datamatics